Pipe inspection
Robotic crawler, push-camera, and lateral-launch inspection to identify blockages, breaks, root intrusion, and structural deficiencies.

An operating company of PEAK Underground
Federal EC provides cured-in-place pipe (CIPP) lining, inspection, cleaning, and utility repair. The team evaluates existing systems and selects rehabilitation methods for the pipe and site conditions.
Federal EC
Established in 1998, Federal EC brings licensed utility contracting, general contracting, and engineering experience to Peak Underground.
The team evaluates buried pipe conditions, cleans and prepares systems, develops practical rehabilitation approaches, and executes targeted repair or replacement. Customers retain Federal EC's established field experience while gaining access to PEAK's broader underground infrastructure resources.
Core capabilities
Federal EC supports owners, engineers, and facility teams with field information and practical repair methods for difficult underground systems.
Robotic crawler, push-camera, and lateral-launch inspection to identify blockages, breaks, root intrusion, and structural deficiencies.
Cured-in-place pipe (CIPP) lining renews suitable pipes from within. Federal EC also applies sliplining, spincasting, and spot repair based on asset condition and project requirements.
Explore CIPP liningHigh-pressure cleaning to remove debris, roots, residue, and mineral buildup before inspection, maintenance, or rehabilitation.
Installation, repair, and replacement for storm, sewer, and water systems using trenchless and conventional construction methods.
Markets served
Federal EC serves public and private infrastructure owners across the Greater Atlanta area, Charlotte, and the Southeast.
Stormwater and sanitary systems serving communities and public rights of way.
Utility and rehabilitation work within controlled and mission-critical facilities.
Buried infrastructure supporting occupied properties and active operations.
Process, drainage, and utility systems where access and downtime matter.

Field approach
Federal EC uses inspection findings, system requirements, access constraints, and owner priorities to define the appropriate cleaning, rehabilitation, repair, or replacement approach.
Project inquiry
Share the system, location, and known condition. PEAK will route the inquiry to the Federal EC team and coordinate any additional capabilities the project requires.
All website inquiries are coordinated through Peak Underground. Engineering on North Carolina projects is offered and performed by Federal Engineering PLLC.