Horizontal directional drilling
Steerable underground installation for crossings and constrained corridors with a smaller surface construction footprint.

An operating company of PEAK Underground
Cinch Underground installs electric, telecommunications, gas, sewer, water, and irrigation systems using horizontal directional drilling and open-trench construction.
Cinch Underground
Founded in 2005, Cinch brings horizontal directional drilling and trenching experience from Northwest Florida to Peak Underground.
The team plans and installs underground utility routes across varied terrain and operating conditions. HDD provides a lower-disturbance option for crossings and constrained sites, while trenching supports accessible alignments and associated utility construction.
Core capabilities
Cinch supports underground utility installations where alignment, surface conditions, existing infrastructure, schedule, and restoration requirements drive the construction approach.
Steerable underground installation for crossings and constrained corridors with a smaller surface construction footprint.
Excavation, pipe or conduit placement, backfill, and restoration for accessible utility alignments.
Water, sanitary sewer, irrigation, and related underground piping for public and private projects.
Underground pathways and lines supporting electric, telecommunications, and gas networks.
Markets served
Cinch serves government, commercial, and residential customers in Northwest Florida and across the Southeast.
Utility installations for public agencies, facilities, rights of way, and infrastructure programs.
Underground service and distribution for businesses, sites, and active developments.
Utility routes serving neighborhoods, individual properties, and community infrastructure.
Routes beneath roads, developed areas, wetlands, and other surface constraints.

Construction approach
Cinch selects HDD or trenching based on the utility, alignment, soil conditions, existing facilities, access, and restoration requirements. The goal is a controlled installation with clear field coordination from setup through completion.